Proposal requested for a worker radiation safety directive, concerning protection from ionising radiation risks, by the Commission.
Ongoing Construction Delays Affect Traffic in Oberhausen
The city of Oberhausen is currently experiencing delays in construction sites, particularly affecting the A42 motorway on-ramp at Oberhausen-Zentrum. These delays are primarily due to ongoing complex roadworks and infrastructure upgrades aimed at improving traffic flow in this heavily trafficked Ruhr area.
A42 On-ramp at Oberhausen-Zentrum to Reopen
Good news for commuters! The A42 on-ramp at Oberhausen-Zentrum, which has been closed for months, is expected to reopen on Monday, September 29, 2025. However, specific detailed reopening dates are not provided, and it is reasonable to expect that reopening will be coordinated to minimize rush-hour impact, likely after completion of major structural upgrades typical for this area’s motorway infrastructure.
Alternative Routes and Detours
During the closure, traffic participants from the north would have to take a detour via Schenkendorfstraße / Arndtstraße. It is also worth noting that the bridge on Weierstraße remains closed to cars, pedestrians, and cyclists until Friday, August 22, 2025.
Road Surface Renovation Postponed
The road surface renovation on Mülheimer Straße, which was scheduled to take place between the entrance to "Hagebaumarkt Ziesak" and Brücktorstraße, has been postponed. The city has not yet announced a new date for this renovation.
City News and Services
To stay updated on the latest news, services, and reports in Oberhausen, you can subscribe to the city's newsletter. By registering for the newsletter, users agree to the advertising agreement. The city also offers thematic pages on Centro, Gastro, Construction sites, RWO, and Local sports.
The city's news services include a family newsletter. Additionally, the city's news app is available for download on both Android and Apple devices. You can also follow the city's updates on Facebook and Instagram.
Construction Sites in Oberhausen
All construction sites, including the motorway construction site on federal motorways 2 and 3, contribute to the heavy use of Mülheimer Straße. The city has decided to postpone the traffic management related to the renovation of the road surface on Mülheimer Straße due to concerns about exacerbating the traffic situation.
In summary, the delays in construction sites around Oberhausen, specifically affecting the A42 motorway on-ramp at Oberhausen-Zentrum, are due to ongoing complex roadworks and infrastructure upgrades aimed at improving traffic flow in this heavily trafficked Ruhr area. It is recommended to monitor local transport authorities’ announcements for the latest status on the A42 ramp reopening.
Read also:
- Avoidable foods during shingles: Hot, spicy dishes, sugary items, and so on
- Connection between Broccoli Consumption and Gout Management: Key Insights
- Home Studio Allergy Management: A Comprehensive Guide for Designers
- Gambling enthusiasts can explore a variety of Playtech slots offered by Hollywoodbets.